Every capability, module by module
What CSA360™ does across the computer system validation lifecycle, from the first estimate to the day a system is retired, and the questions validation teams ask most.
Estimate: know what it will take
Size the validation of a system before you commit to it, from a method your organisation controls.
Validation effort estimate
Effort by role from a controlled method, compared with actuals, then priced on a rate card and downloaded as an Excel bid. The portfolio shows the hours of each system's latest approved estimate beside the work still to do.
Estimates that improve from your actuals
From the reviewed actual hours of your approved estimates, CSA360 proposes better unit effort for each work package of the estimating method: the median observed as most likely, with the lowest and highest as the range, shown against the method's current rate.
A person accepts each change
A person accepts some or all of the proposals into the next draft version of the method. The accepted rates name the estimates they came from.
Signed into use by someone else
A second person signs the new method version into use. Until then the method in effect and your approved estimates stay as they are.
Assess: decide how much is enough
Record the risk of each intended use, and let a policy your organisation signs decide how deep assurance goes.
Risk assessment
Record the impact on patient safety, product quality and data integrity for each intended use, with the GAMP software category and any escalation triggers.
GxP, ERES and data-integrity assessment
A signed assessment per system states which records and which signatures the system holds electronically.
19 controls, each answered
For each of 19 controls from 21 CFR Part 11, EU GMP Annex 11 and ALCOA+ data integrity, the assessment states whether it applies and how it is met, or why it does not apply.
Assessment signed by QA and versioned
QA, who wrote none of it, signs the assessment. A signed assessment never changes: a revision starts from the signed answers and supersedes it when signed, and it is issued as a controlled document.
Risk-based validation strategy
Your signed policy table selects the depth of assurance, and the strategy states what is deliberately not tested and why.
Supplier questionnaire templates
Keep versioned supplier questionnaire templates for your workspace. A built-in template covers ten topics: quality system, development, testing, change, security, backup, incidents, subcontractors, data integrity and support.
Supplier answers or audit outcome
Record the supplier's answers to the questionnaire, or the outcome of a supplier audit (the date, the auditor, the findings by severity, the verdict and where the report is kept), on the vendor assessment.
Sealed by the assessment's signature
The assessment's signature seals the supplier's answers or the audit outcome along with the rest of the assessment, and a signed assessment never changes.
Validate: show that it works
Carry a system from a signed strategy to a signed conclusion on one traceable record.
Validation projects
Group the work for one event on one system, an initial validation, a change or a revalidation, into a project. Its plans, documents and conclusions sit together and its stage follows from the work.
Requirements and validation plan
Import requirements from CSV or Excel with versions and a signed baseline, then start a validation plan from the signed strategy.
Starter libraries for common GxP systems
Starter libraries for Veeva Vault QualityDocs, SAP S/4HANA Cloud, Salesforce Service Cloud, Microsoft 365 (SharePoint) and ServiceNow ITSM. Each holds requirements with their risk, configuration items and scripted tests to adapt, and was reviewed by a validation professional.
Load a starter library into a system
A system picks the closest library by vendor or name, shows what it already holds, and loads it. Requirements go in through the requirement import, configuration items into the register, and tests as drafts.
Nothing you adapted is overwritten
Loading skips whatever the system already has, so a requirement, configuration item or test you adapted is never overwritten. Nothing is approved by loading.
URS, functional and design specifications
The user requirements, functional and design specifications are generated from the signed requirement baseline as numbered, versioned controlled documents, each listing the baselined requirements of its type with their risk and data integrity control.
Functional risk per requirement
Rate each requirement for severity, likelihood and detectability. The GAMP 5 risk class and priority follow from the ratings, and the database enforces it.
Test rigour set by risk
The priority decides the rigour: high needs a scripted test, medium a scripted or exploratory test, and low an exploratory test or accepted supplier evidence.
Configuration item register
Each system keeps a register of its configuration items: the setting, the value it must have and the rationale. Items are edited and retired, never deleted.
Configuration baseline and specification
QA signs a configuration baseline, a frozen copy of the active items, and the signer cannot be someone who edited any of them. The register shows exactly what changed since, and the configuration specification is issued from the signed baseline.
Test cases and test execution
Write test cases by hand, from a template or with AI drafting. Execute step by step with a witness, evidence files and screen captures, or import JUnit XML and CSV results.
Reusable test library
The workspace keeps a test library of scripted tests, with their preconditions and steps, and exploratory charters, filed by category. Save any test to the library, or add a template.
Start a test from the library
Start a new test on any system from a library template. The test form is pre-filled, the person gives the key and what it covers, and the result is an ordinary draft that someone else approves.
Versioned templates, written tests unchanged
Editing a template makes its next version, and a test already written never changes. Each test started from the library records the template and version it came from.
IQ, OQ and PQ test protocols
A protocol per stage of testing, IQ, OQ, PQ or your own stage name, with its objective, prerequisites, acceptance criteria and the approved test cases it runs.
QA approval before and after execution
QA signs a protocol before execution, and its tests cannot run until then. QA signs again once every run is reviewed and every incident is dispositioned. Authors and executors cannot approve.
Run review queue
Reviewers work completed runs from one queue: failed runs first, then high-risk passes, runs that raised an incident and runs of high-risk requirements. A high-risk pass needs evidence before it can be accepted.
Protocol reports
The protocol and its report are generated from the reviewed runs and issued as numbered, versioned controlled documents, with Word downloads in your own template.
Validation deviations
Every test incident becomes a numbered validation deviation, closed with a recorded investigation: classification, root cause, impact on validation and resolution. The database refuses a closure without it.
Deviation classification and CAPA reference
Classify each deviation as a script error, execution error, system defect, configuration, environment, specification error or other, and record an optional CAPA reference to your eQMS.
Deviation log
Each protocol has a deviation log with the test, severity, classification, root cause, impact, resolution and retest outcome, listed on the project page too and issued as a controlled document that a second person approves.
Supplier evidence
Claim a supplier's own test evidence for specific requirements, and have a different reviewer accept it. It shows beside the requirement in the traceability matrix and the signed conclusion, labelled as the supplier's.
Requirements traceability matrix
A live matrix from requirement to risk, test, result and evidence, with gaps named, as a page, Excel and PDF.
Rigour checked in the matrix
The traceability matrix shows each requirement's ratings, risk class and required rigour, and whether its covering tests meet it.
Validation summary report
A signed conclusion and a validation summary report close the record, with every approval by someone other than the author. The report includes a deviation summary and the open items.
Release for use certificate
QA signs a release certificate that freezes the latest signed conclusion, the intended uses and every current controlled document with its approvals. It is refused while any deviation is open, and it is issued as a controlled document.
Client approvals recorded
Record a client's approval made outside CSA360, in wet ink or in the client's own e-signature, against each issued document: who, role, organisation, date, how and where the signed copy is kept.
Full validation package
Export every current controlled document as HTML and Word in one zip, with a manifest of each document's number, version, status, approvals and hashes, and a README. The export is audited.
Spreadsheet validation
Validate GxP spreadsheets as validated items. Each workbook version is identified by its file hash, and the next version of the workbook is the next validation.
Formula checks and protection checklist
Formulas are checked against independently worked results, and the protection checklist is completed: locked cells, sheet and workbook protection, input validation, macros, controlled storage, versioning and change control.
Spreadsheet validation signed, with a worksheet
Someone who did not perform the validation signs it, and only when every check passes. A signed validation never changes and is issued as a controlled document, and a downloadable Excel worksheet is included.
Data migration validation
A data migration project carries a migration record: the plan, with the source, target, data in scope, approach and acceptance criteria, and the field mapping.
Migration plan approved before the migration
Someone who wrote neither the plan nor the mapping approves them before the migration, and the plan is issued as a controlled document.
Migration verification and report
After the migration, each data object is verified with record counts and sampled checks. A person who did not write the report approves it, it is refused while any mismatch is unexplained, and it is issued as a controlled document.
System retirement record
A retirement project carries a retirement record with the plan: why the system is retiring, what happens to its data, the retention period and basis, how retained records are read afterwards and the decommissioning steps.
Retirement plan approved before decommissioning
Someone who did not write the plan approves it before decommissioning, and the plan is issued as a controlled document.
Retrieval test and retirement report
The archive and retention check records where and how the data is archived and the result of a retrieval test, with the decommissioning date and the conclusion. A person who did not write the report approves it only once retrieval has passed, the approval marks the system retired in the inventory, and the report is issued as a controlled document.
Assure: keep it valid as things change
Know what each validated state rests on, react when something changes, and explain it to an inspector.
Change impact assessment
Triage vendor release notes item by item against your intended uses and requirements, and classify earlier evidence with a written reason.
Release notes feed
CSA360's own release notes are published as an RSS feed you can subscribe to like any vendor's. Each release is classified major, minor or hotfix, says whether it affects validation, and is tied to the exact build.
Targeted revalidation
A signed reassessment starts a plan that reopens only the requirements the change affects.
Change approval by QA
Once the impact is confirmed and the reassessment decision signed, QA approves the change to a validated system for implementation by e-signature, stating the planned change and, where your eQMS owns change control, its reference there.
Implementation record
The implementer records what was done against the approved change, so the approval, the implementation and the closure sit on one change record.
Change verification and closure
Someone who did not implement the change verifies and closes it with a second signature. Closure waits until the configuration register matches its signed baseline and any required revalidation project is closed.
Change connector contract
Changes come in from your ITSM, a vendor feed or your eQMS through an open, documented connector contract, each identified by its source and your own reference.
Impact and revalidation decision on request
Your system can ask CSA360 for the impact assessment and the revalidation decision of any change it sent.
Change-control status on request
The same request shows where change control stands for that change: the approval, the implementation, the verification and the closure.
QMSdesk connection
QMSdesk and CSA360 connect. Each QMSdesk workspace connects its own CSA360 workspace, and a change control is sent from QMSdesk to CSA360.
Validation decision on the QMSdesk change
A change sent from QMSdesk shows its validation consequence on the QMSdesk change, read from CSA360 on request: the impact, the revalidation decision and the change-control status.
One change, one reference
The QMSdesk change number is the change's reference in CSA360, so a change sent again is the same change.
Release timeline
Every change shows a timeline from the vendor's publication through the impact, the decision, the approval, the revalidation, the implementation and the closure to the release-for-use certificate.
Days from publication to production
The timeline ends with the days elapsed, from vendor publication to back in production, so you can see how long each vendor release took.
Each step from its own record
Each milestone is the timestamp of the record that made it: the impact assessment, the signed decision, the change approval, the revalidation project and the release certificate.
Release pack
One controlled document of how a vendor release was handled, from the change and its impact assessment to the targeted revalidation, the signed conclusion and the supplier's files, with a manifest and checksums.
Periodic review
Reviews of validated systems, signed by two people.
User access review
A periodic, signed review of who can use each validated system. The reviewer lists every account with its role and a decision: keep, change or remove.
Access review findings and due date
Findings and the next review date are recorded, and the system shows when a review is due or overdue. The next review starts from the accounts kept.
Access review signed and issued
Someone who did not perform the review signs it, a signed review never changes, and it is issued as a controlled document.
Backup and restore test record
A record per test of a system's backup and restore: the date, what was backed up, how the restore was done and checked, and the result.
Observations and evidence reference
The observations are recorded with a reference to where the evidence is kept, such as a ticket or a share location.
Restore test signed and issued
Someone who did not perform the test signs the record, a signed record never changes, and it is issued as a controlled document.
Inspection narrative and inspection pack
A sealed, signed narrative per system and for the portfolio, which can be reconstructed as of a past date, with an inspection pack from the inspection room.
Across every module
The record, the documents, the integrations and the data that every module shares.
Validation master plan
A master plan for the workspace, generated from your own records: the purpose and scope, your active signed assurance policy, the validation lifecycle, the system inventory with impact, data integrity criticality, state and last release, the signed validation plans, the review schedules and the responsibilities.
Master plan signed and versioned
Someone who did not generate the master plan signs it. A signed version never changes, and each new signed version supersedes the last.
Master plan as Word or PDF
Download the master plan as Word in your own template, or as PDF. The signature is shown on both.
A workspace for each client
Consultancies run each client in its own workspace and switch between them from one sign-in. Moving into a workspace asks for the second factor, as at sign-in.
Questionnaire and test templates copied into a client
A member of both workspaces copies the firm's supplier questionnaire templates and test templates into a client's workspace.
Signed handover package
On handover, the client signs a package holding every system's full validation package and a manifest of each current document with its hash. The firm's access then ends, and the client's own people keep theirs.
Validation package for your auditor
A validation package for your auditor, generated from our test evidence for each release of CSA360: intended use and scope, risk assessment, test evidence, a matrix of Part 11 and Annex 11 controls, release notes and a change notice.
Generated from the release's test run
The package is generated from each release's automated test run. Each CSA360 requirement is traced to the test that carries it, with its result in that run.
Control matrix and change notice
The matrix uses the same 19 controls you assess your own systems against. Each control states how CSA360 meets it, citing the tests that prove it or saying where a procedure covers it. The change notice names the release entries with validation impact for you to re-check.
Workspace archive
Download the whole workspace as one file: every record, the full audit trail, every signature and every evidence file.
Verified on your own computer
The archive comes with a checker that verifies it is complete and unaltered on your own computer, with nothing of ours running.
Take all your data with you
The archive is available after a licence ends, so you can take all your data with you, verifiable without us.
Signed webhooks to your own systems
CSA360 notifies your own systems, such as your eQMS, ALM or ITSM, through webhooks. Each event is signed with HMAC-SHA256, so the receiver can verify it came from CSA360.
Choose the events you receive
A workspace administrator adds an HTTPS endpoint and chooses from a catalogue of events: changes received, impact confirmed, decisions and records signed, change-control steps, test runs completed and reviewed, and inspection narratives released.
A documented, open API
The integration API is published as an OpenAPI 3.1 specification covering the change endpoints, the release-notes feed and how to verify a webhook event.
Validation status for your own tools and AI agents
A documented API answers "is this system validated for this use?" from signed records only, so your own systems and AI agents can ask.
Five answers per use
For each intended use, the answer is validated, validated with conditions, change pending, not validated or retired. Conditions and open changes come back with the answer.
Your workspace only, every question recorded
The API answers only for your own workspace, with your workspace's integration key, and every question is recorded in the audit trail.
Controlled document register
Each system keeps a register of issued deliverables, numbered, versioned and frozen. Word downloads go into your own template, and a changed source issues the next version under the same number.
Audit trail and electronic signatures
An append-only, hash-chained audit trail, electronic signatures designed around 21 CFR Part 11, separation of duties enforced in the database, and the signer's name, date, time and meaning shown on every generated document.
Computer System Validation and CSA, Answered
CSA360 and validation basics
What is CSA360™?
CSA360™ is a validation platform for GxP computerised systems, in four modules on one shared record: Estimate the effort, Assess the risk and decide how much to validate, Validate with traceable evidence, and Assure the validated state as systems change.
What is computer system validation (CSV)?
Computer system validation (CSV) is the documented process of showing that a computerised system used in a GxP-regulated environment does what it is intended to do, consistently. CSA360™ manages that process from the risk decision, through test execution, to a signed conclusion and validation summary report.
What is computer software assurance (CSA), and how does CSA360™ support it?
Computer software assurance (CSA) is a risk-based approach to assuring software, in which effort is focused where a failure could matter and the reasoning is recorded. CSA360™ records the risk of each intended use, lets your own signed policy set the depth of assurance, and states in writing what is deliberately not tested and why.
How does CSA360™ support risk-based validation and GAMP 5?
The Assess module reads the impact on patient safety, product quality and data integrity, the GAMP software category and any escalation triggers, then applies your organisation's signed policy table. The same inputs always select the same row, and the row, the triggers and the references it cites from the controlled library, including GAMP 5 Second Edition, are shown beside the decision.
Which systems and organisations is CSA360™ designed for?
CSA360™ is designed for SaaS, on-premises and hybrid GxP computerised systems in pharmaceutical, biotechnology, medical device, and contract research and manufacturing organisations, and for the QA, validation, digital quality and inspection teams who work on them.
Does CSA360™ work alongside our eQMS?
Yes. CSA360™ holds the validation record, meaning the decision, the work and the evidence, and produces the controlled documents you file in your eQMS.
How does CSA360™ use AI in validation?
AI can draft rationales, test cases and release-note triage using your organisation's own model key. A draft is only a draft: a person approves every one before a signed record can cite it, and citations come only from CSA360's controlled library. Without a key, a built-in template does the drafting.
How does CSA360™ handle electronic signatures, the audit trail and 21 CFR Part 11?
Signatures are electronic signatures designed around 21 CFR Part 11: the signer signs in again at the moment of signing. The audit trail is append-only and hash-chained, so an altered or removed entry shows, and separation of duties is enforced in the database. 21 CFR Part 11 and EU Annex 11 are both in the controlled library CSA360™ cites from.
Assess, plan and specify
Does CSA360™ produce a validation master plan?
Yes. The validation master plan is generated from your workspace's own records, not typed: the purpose and scope, your active signed assurance policy, the validation lifecycle, the system inventory with each system's impact, data integrity criticality, state and last release, the signed validation plans, the review schedules (the next periodic review and access review) and the responsibilities.
How is the validation master plan signed and issued in CSA360™?
Someone who did not generate the master plan signs it, and a signed version never changes. Each new signed version supersedes the last. It downloads as Word in your own template or as PDF, with the signature shown.
Does CSA360™ include an ERES and data integrity assessment?
Yes. Each system has a signed assessment that states which records and which signatures it holds electronically. For each of 19 controls from 21 CFR Part 11, EU GMP Annex 11 and ALCOA+ data integrity, it states whether the control applies and how it is met, or why it does not apply.
How is the ERES and data integrity assessment signed and versioned in CSA360™?
QA, who wrote none of it, signs the assessment. A signed assessment never changes: a revision starts from the signed answers and supersedes it when it is signed. The signed assessment is issued as a numbered, versioned controlled document.
Does CSA360™ support supplier questionnaires and audit outcomes?
Yes. Supplier questionnaire templates are versioned for your workspace, and a built-in template covers ten topics: quality system, development, testing, change, security, backup, incidents, subcontractors, data integrity and support. The supplier's answers, or the outcome of a supplier audit, are recorded on the vendor assessment.
What is recorded for a supplier audit in CSA360™?
The audit outcome records the date, the auditor, the findings by severity (critical, major and minor), the verdict and where the report is kept. The assessment's signature seals the audit outcome, or the supplier's answers, and a signed assessment never changes.
What is a validation project in CSA360™?
A validation project is the validation work for one event on one system: an initial validation, a change or a revalidation. It groups the plans written for that event, and its stage, planning, in execution, concluded, closed or cancelled, follows from the work.
Does CSA360™ generate a URS, functional specification and design specification?
Yes. Requirements carry a type: user, functional or design. The user requirements specification (URS), functional specification and design specification are generated from the signed requirement baseline as numbered, versioned controlled documents, each listing the baselined requirements of its type with their risk and data integrity control, and each approved by the baseline's own signature.
How does CSA360™ manage configuration baselines?
Each system has a register of configuration items: the setting, the value it must have and the rationale. Items are edited and retired, never deleted. QA signs a configuration baseline in one step, a frozen copy of the active items, and the signer cannot be someone who edited any of them. The register shows what changed since the baseline was signed, with old and new values, and the configuration specification is issued from the signed baseline.
How does CSA360™ assess functional risk for each requirement?
Each requirement can be rated for severity, likelihood and detectability. Severity and likelihood give a risk class, and the class with detectability gives the GAMP 5 priority, so the risk follows from the ratings and the database enforces it.
How does risk decide the amount of testing in CSA360™?
The priority decides the test rigour: a high priority needs a scripted test, a medium priority a scripted or exploratory test, and a low priority an exploratory test or accepted supplier evidence. The traceability matrix shows each requirement's ratings, risk class and required rigour, and whether its covering tests meet it.
Does CSA360™ have starter libraries for common GxP systems?
Yes. Starter libraries cover Veeva Vault QualityDocs, SAP S/4HANA Cloud, Salesforce Service Cloud, Microsoft 365 (SharePoint) and ServiceNow ITSM. Each holds requirements with their risk, configuration items and scripted tests to adapt, and was reviewed by a validation professional.
How is a starter library loaded in CSA360™?
A system picks the closest library by vendor or name and loads it. The requirements, configuration items and tests arrive in the system for you to adapt, and anything the system already has is left as it is, so nothing you adapted is overwritten. Tests arrive as drafts, and nothing is approved by loading.
Test, resolve and conclude
Does CSA360™ produce a validation plan, traceability matrix and validation summary report?
Yes. A validation plan starts from the signed strategy. A live traceability matrix links each requirement to its risk, test, result and evidence, with gaps named, and exports as Excel and PDF. A signed conclusion and a validation summary report, with a deviation summary and the open items, close the record.
How does CSA360™ handle test execution and validation evidence?
Tests run step by step, expected against actual, with a witness where needed. Evidence files and screen captures are stored with a hash, and someone other than the performer reviews the result. Automated results can be imported from JUnit XML or CSV files, labelled as imported and attested by a person.
Can CSA360™ use a supplier's own test evidence?
Yes. A person claims a piece of the supplier's test evidence for specific requirements, naming the supplier document and section, the product version it was produced on and why it applies to your intended use. A different reviewer accepts or rejects the claim, and accepted evidence shows beside the requirement in the traceability matrix, the signed conclusion and the validation summary report, labelled as the supplier's.
Does CSA360™ support IQ, OQ and PQ protocols?
Yes. A protocol is one stage of testing under a validation plan, IQ, OQ, PQ or your own stage name, with its objective, prerequisites, acceptance criteria and the approved test cases it runs. QA signs it before execution and its tests cannot run until then, and QA signs again once every run is reviewed and every incident is dispositioned, with a written assessment against the acceptance criteria. Authors and executors cannot approve. The protocol and its protocol report are issued as numbered, versioned controlled documents.
Can a later protocol retest the same tests after a change?
Yes. Only runs started after a protocol is approved for execution count towards it, so a later protocol can run the same approved test cases again after a change.
How does CSA360™ handle validation deviations?
Every test incident becomes a numbered validation deviation. It is closed with a recorded investigation: a classification as a script error, execution error, system defect, configuration, environment, specification error or other, the root cause, the impact on validation and the resolution, with an optional CAPA reference to your eQMS. The database refuses a closure without the investigation.
Does CSA360™ produce a deviation log?
Yes. Each protocol has a deviation log listing the deviations raised on its runs, with the test, severity, classification, root cause, impact, resolution and the retest outcome. The project page lists them across its protocols, and the log is issued as a controlled document that a second person approves.
Can tests be reused across systems in CSA360™?
Yes. The workspace has a test library of scripted tests and exploratory charters. Any test can be saved to the library, and a new test on any system can start from a library template, with the test form pre-filled.
What happens to written tests when a library template changes in CSA360™?
Nothing. Editing a template creates its next version, and a test already written never changes. A test started from the library is an ordinary draft that someone other than the author approves, and it records the template and version it came from.
Can CSA360™ validate GxP spreadsheets?
Yes. A GxP spreadsheet is a validated item with its own spreadsheet validation for each workbook version. The version is identified by its file hash, formulas are checked against independently worked results, and the protection checklist is completed: locked cells, sheet and workbook protection, input validation, macros, controlled storage, versioning and change control. A downloadable Excel worksheet is included.
How is a spreadsheet validation signed in CSA360™?
Someone who did not perform the validation signs it, and only when every check passes. A signed validation never changes, the next version of the workbook is the next validation, and it is issued as a controlled document.
Does CSA360™ produce a release-for-use certificate?
Yes. QA signs a release certificate that freezes the latest signed conclusion, the intended uses and every current controlled document with its approval and any external approvals. It is refused while any deviation on the system is open, and it is issued as a controlled document.
Can CSA360™ export the full validation package?
Yes. One export gives every current controlled document as HTML and Word, in your template where one is set, with a manifest of each document's number, version, status, approvals, external approvals and hashes, and the release certificates. Client approvals made outside CSA360, in wet ink or the client's own e-signature, are recorded against each document and listed in the package.
Does CSA360™ produce controlled validation documents in our own template?
Yes. Each system has a register of issued deliverables, such as the risk assessment, ERES and data integrity assessment, strategy, validation plan, user, functional, design and configuration specifications, test protocols, protocol reports and deviation logs, traceability matrix and validation summary report, numbered, versioned and frozen. Word downloads go into a template you upload, with your styles, headers, footers and images, and a changed source issues the next version under the same number.
Change, release and ongoing control
How does CSA360™ keep a system validated after a vendor release or change?
A change is recorded by hand, through the inbound API, or from RSS, Atom and Statuspage feeds. Release notes are triaged item by item against your intended uses and requirements. A person confirms the impact and classifies earlier evidence as retained, partly applicable, superseded, invalidated or review required, with a written reason, and a signed reassessment can start a targeted revalidation that reopens only the affected requirements.
What is a CSA360™ release pack?
A release pack is one controlled document of how a vendor release was handled: the change and its triaged items, the impact assessment, the signed reassessment, the targeted revalidation, the results for the affected requirements, the newest signed conclusion and the supplier's own files. A manifest and checksums let the receiver check it, and readiness checks say whether it is ready.
Does CSA360™ support change control for validated computerised systems?
Yes. Once the impact is confirmed and the reassessment decision signed, QA approves the change for implementation by e-signature, stating the planned change and, where your eQMS owns change control, its reference there. The implementer records what was done, and someone who did not implement it verifies and closes the change with a second signature.
When can a change be closed in CSA360™?
Closure is refused while the configuration register differs from its signed baseline, so the new baseline is signed first, and, when the decision required reassessment, until the validation project opened for the change is closed.
Can CSA360™ show how long a vendor release took to handle?
Yes. Every change shows a release timeline from vendor publication through impact, decision, approval, revalidation, implementation and closure to the release-for-use certificate. It ends with the days elapsed, from publication to back in production.
Where do the dates on the CSA360™ release timeline come from?
Each step is the timestamp of the record that made it, such as the impact assessment, the signed decision, the change approval, the revalidation project and the release certificate, so you see how long each vendor release took from its own records.
Does CSA360™ support periodic user access review?
Yes. Each validated system has a periodic, signed access review. The reviewer lists every account reviewed with its role and a decision to keep, change or remove it, and records the findings and the date the next review is due.
How is a user access review signed and tracked in CSA360™?
Someone who did not perform the review signs it, and a signed review never changes. The latest signed review sets the next due date, which the system shows as due or overdue, and the next review starts from the accounts kept. A signed review is issued as a controlled document.
Does CSA360™ keep backup and restore test records?
Yes. Each system can have a signed record per backup and restore test: the date, what was backed up, how the restore was done and checked, the result, the observations and where the evidence is kept. The record references the evidence, such as a ticket or a share location.
How is a backup and restore test record signed in CSA360™?
The performer records the test and can correct the draft. Someone who did not perform it signs it, a signed record never changes, and it is issued as a controlled document.
Does CSA360™ support data migration validation?
Yes. A data migration project carries a migration record with the plan (source, target, data in scope, approach and acceptance criteria) and the field mapping. Someone who wrote neither approves them before the migration, and the plan is issued as a controlled document.
How is a data migration verified and reported in CSA360™?
After the migration, the verification is recorded for each data object with record counts and sampled checks. A person who did not write the report approves it, the approval is refused while any mismatch is unexplained, and the report is issued as a controlled document.
Does CSA360™ support system retirement and decommissioning records?
Yes. A retirement project carries a retirement record with the plan: why the system is retiring, what happens to its data, the retention period and basis, how retained records are read afterwards and the decommissioning steps. Someone who did not write the plan approves it before decommissioning, and the plan is issued as a controlled document.
How is a system retired and the retirement approved in CSA360™?
The retirement record holds the archive and retention check, which records where and how the data is archived and the result of a retrieval test, with the decommissioning date and the conclusion. A person who did not write the report approves it only once retrieval has passed, the approval marks the system retired in the inventory, and the report is issued as a controlled document.
How does CSA360™ help with inspection readiness?
Each system can have a sealed, signed inspection narrative, and so can the portfolio, and either can be reconstructed as of a past date. Your QA team shares released records in an inspection room, logs the inspector's requests, and can download an inspection pack.
Integrations, data and estimates
How do an ITSM or an eQMS send changes to CSA360™?
Changes come in from your ITSM, a vendor feed or your eQMS through an open, documented change connector contract. Each change is identified by its source and your own reference, so your system can find it again.
Can our system ask CSA360™ where a change stands?
Yes. Your system can ask CSA360™ for the impact assessment, the revalidation decision and the change-control status of any change it sent, including the approval, the implementation, the verification and the closure.
Do QMSdesk™ and CSA360™ connect?
Yes. Each QMSdesk workspace connects its own CSA360 workspace. A change control sent from QMSdesk shows its validation consequence on the QMSdesk change: the impact, the revalidation decision and the change-control status.
How does a QMSdesk™ change appear in CSA360™?
The QMSdesk change number is its reference in CSA360™, so a change sent again is the same change. CSA360™ records the impact, the revalidation decision and the change control, and the QMSdesk change reads and shows them on request. A workspace can also have CSA360™ send signed webhook events to endpoints of its choice.
Can CSA360™ notify our own systems with webhooks?
Yes. CSA360™ sends signed webhooks to your own systems, such as your eQMS, ALM or ITSM. A workspace administrator adds an HTTPS endpoint and chooses the events: changes received, impact confirmed, decisions and records signed, change-control steps, test runs completed and reviewed, and inspection narratives released.
Is the CSA360™ integration API documented?
Yes. The integration API is published as an OpenAPI 3.1 specification covering the change endpoints, the release-notes feed and how to verify a webhook event. Each event is signed with HMAC-SHA256, so the receiver can verify it came from CSA360™.
Can our own systems and AI agents ask CSA360™ whether a system is validated?
Yes. A documented API answers whether a system is validated for a use, from signed records only. For each intended use it returns validated, validated with conditions, change pending, not validated or retired.
Who can call the CSA360™ validation status API, and is it recorded?
It is read-only and answers only for your own workspace, using your workspace's integration key. Every question is recorded in the audit trail with the answer that was given.
Can we take all our data out of CSA360™?
Yes. A workspace administrator downloads the whole workspace as one file: every record, the full audit trail, every signature and every evidence file. The archive is available after a licence ends.
How do we check that a CSA360™ archive is complete?
The archive includes a checker that verifies it is complete and unaltered on your own computer, with nothing of ours running. It re-checks the file hashes, the audit trail chains and the signature links.
Does CSA360™ come with a validation package for client auditors?
Yes. For each release, a validation package for your auditor is generated from our test evidence: intended use and scope, risk assessment, test evidence, a matrix of 21 CFR Part 11 and EU Annex 11 controls, release notes and a change notice.
How is the CSA360™ validation package for auditors generated?
It is generated from the automated test run of the release itself. Each CSA360 requirement is traced to the test that carries it, with its result in that run, and each control in the matrix cites the tests that prove it or says where a procedure covers it.
Can a consultancy run its clients' validations in CSA360™?
Yes. A consultancy runs each client in its own workspace and switches between them from one sign-in, with the second factor asked on each move. It can copy its questionnaire and test templates into a client's workspace.
How does a consultancy hand a CSA360™ workspace over to its client?
The client signs a handover package: every system's full validation package with a manifest of each current document and its hash. On handover the firm's access to the client's workspace ends, and the client's own people keep theirs.
Do CSA360™ estimates improve from our actuals?
Yes. From the reviewed actual hours of your approved estimates, CSA360™ proposes better unit effort for the estimating method. A person accepts the proposals into a new method version, and someone else signs it into use, so a person approves every change.
How does CSA360™ recalibrate an estimating method?
For each work package, the proposal shows the median observed effort per unit as most likely, with the lowest and highest observed as the range, against the method's current rate. A person accepts some or all of it into the next draft version, whose accepted rates name the estimates they came from, and a second person signs the version into use.